The Black Water of Dee Restoration Project (phase 1) was undertaken to explore how to restore natural river processes and the wider river ecology back to 20km of the watercourse. This large tributary has become severely degraded due to the drainage of nearby peatlands, extensive conifer afforestation and the construction of Clatteringshaws Dam (part of the Galloway Hydro Scheme) in the 1930’s. An expanded phase 2 work programme has now started and will run from 2023 until 2025.
In 2016 GFT undertook a study of the lower Black Water of Dee (BWD) from where it flows into Loch Ken up to Clatteringshaws Dam. Habitats over this 20km length were found to be very degraded, explaining why the ecology of the river was so poor. There is no fish pass fitted on Clatteringshaws Dam so fish are unable to access the habitats upstream. The report is available as a download.
The main concerns highlighted in the study were:
To address the multiple pressures required a wide partnership of organisations to come together. A steering group was set up with a membership of GFT, DRAX, Forestry and Land Scotland, SEPA, NatureScot, Kirkcudbrightshire Dee District Salmon Fishery Board and Galloway Glens Landscape Partnership. A programme of works was agreed to be delivered as a phase 1. A great deal of these works were undertaken to trial restoration techniques to check their suitability to restore the BWD and also some events were held to inform the local community of the project and to give opportunities for people to get involved in the practical works.
The phase 1 work programme was delivered between 2020 - 2022 and achieved the following:
Using lessons learned from phase 1, a phase 2 work programme was developed and funding secured in 2023. Phase 2 works are being funded mainly by the Nature Restoration Fund and with match funding from GFT, DRAX and FLS. Phase 2 works will be delivered between 2023 - 2025 and will include:
The GFT and Bladnoch DSFB are running a hatchery programme this year to stock the upper Tarf to help ameliorate acidification problems and help recover salmon stocks in key areas.
The long awaited Sparling Bridge successfully opened on Saturday 30th November. Crowds gathered either side of the bridge on the sunny afternoon to celebrate the grand opening of the new pedestrian and cycle bridge connecting the communities of Minnigaff and Newton Stewart.
The Galloway Fisheries Trust is working with Natural England to produce a detailed Smelt Restoration Management Plan for the inner Solway Firth, to be the framework for European smelt (sparling) recovery in designated Marine Conservation Zones (MCZs) around England and Wales.